Back
Job   USA   FL   Melbourne Area   Mechanic   Ladgov -

Bowling Mechanic | Mechanic in Construction Job at Ladgov in Melbourne FL | 7124737579

This listing was posted on The Resumator.

Bowling Mechanic

Location:
Melbourne, FL
Description:

Position Title: Bowling Technician Location: Patrick Space force Base Routine Lane Maintenance Services General: The applicant shall be responsible for performing and documenting preventive lane maintenance services. Daily preventive maintenance shall include the following and shall be documented on the checklist provide in Appendix A: Check call sheets for the previous day and transfer calls to stop summary Cycle/check machines, foul lights and related equipment Investigate/correct machines that have developed a malfunction pattern Clean ball lift and distributor belts Clean pin elevator Clean pin guide and orientor pan Keep work area, workbench and service isle clean & orderly Assign and record preventive maintenance on the preventive maintenance charts Weekly preventive maintenance shall include the following and shall be documented on the checklist provide in Appendix A: Clean shuttle and bin Clean, check ball door exit, lift arm, paddle, LBS operation Clean ball lift assembly, lift rods Clean pit carpet belt Clean pin curtain, cushion, drip pans Tighten plows, check for cracks and replace as needed Change ball wipes Clean bowling pins Inspect distributor, observe for proper operation and correct as needed Monthly preventive maintenance shall include the following and shall be documented on the checklist provide in Appendix A: Check, clean, correct, adjust, spotting cups, respot cells, and table assembly in general. Check, clean correct adjust, sweep assembly Check, clean, correct ball tracks, down sweeps Check, correct, adjust carpet belt tracking, front and rear rollers Check, correct, adjust bounce board, dampers, supports, ground strap Check, correct, adjust cushion assembly and shock Blow out sweep and table brakes Check all machine belts, replace asneeded Clean distributor assembly Quarterly preventive maintenance shall include the following and shall be documented on the checklist provide in Appendix A: Clean the machine framework, drip pans Complete quarterly lubrication items Tighten front and rear jackscrews Tighten pin cushion and hangar boxbolts Remove distributor clutch assembly. Clean the pinion and sleeve, friction disks metal and plastic. Use fine emery cloth to smooth friction disk. Lubricate pinion and sleeve and reassemble. Check: pin holder brackets, shuttle straps, shuttle operator rod. Repair as needed. Tighten shuttle bolts. Yearly preventive maintenance shall include the following and shall be documented on the checklist provide in Appendix A. Check the following for worn or broken parts, repair or replace as needed: Table and sweep arms, shaft bushings, keyways and pillow blocks Complete annual lube chart items Check/correct gearbox oil leaks and change oil Rebuild table drive Rebuild carpet roller and pit assembly Rebuild distributor assembly Rebuild ball lift assembly, light ballsensor Clean underground return tracks, tighten down sweep track Routine Lane Machine Services 4.1 General: The contractor shall be responsible for performing and documenting lane machine services as shown below: Daily preventive maintenance shall include the following and shall be documented: Using a clean cloth, wipe down the entire length of the power cord Completely wipe down oil compartment. Do not clean the transfer brush or buffing brush unless needed Clean drip pads on each side of the machine in the oil compartment Clean the drive, lane distance and momentary wheels. Dust & lint shall not be allowed to build up Wipe squeegee clean & inspect for wear. An extra set of blades must be kept on-site as a backup and must be stored in a dark cool space Wipe down front of the machine Wipe off outside of the machine Monthly preventive maintenance shall include the following and shall be documented: Using compressed air, remove dust from all surfaces Inspect recovery tank filter. Replace as specified in Appendix 3 or as needed Clean lint from transfer brush and clean between brushes Replace duster cloth if required. If the duster cloth is changed clean the entire cleaning compartment and lube the cleaner head bar Wipe off casters Remove large black covers and clean around the motors Inspect the motor end of the vacuum and make sure dust does not build up on the cover for the vacuum motor Inspect vacuum housing and troubleshoot if wet Inspect power cord (ends and entire length) for splits or wearing. Replace as needed for proper operation and safety Routine Supplies and Parts: The contractor shall furnish The Alley Manager with a list of required supplies and required stock levels to perform routine service and preventive maintenance on at least a monthly basis. The Alley Manager will ensure required routine supplies and parts are on-hand prior to on-site visits. The Alley Manager will provide all applicable owner/operating manuals for machinery to be maintained. Powered by JazzHR
Company:
Ladgov
Posted:
January 2 on The Resumator
Visit Our Partner Website
This listing was posted on another website. Click here to open: Go to The Resumator
Important Safety Tips
  • Always meet the employer in person.
  • Avoid sharing sensitive personal and financial information.
  • Avoid employment offers that require a deposit or investment.

To learn more, visit the Safety Center or click here to report this listing.

More About this Listing: Bowling Mechanic
Bowling Mechanic is a Construction Mechanic Job at Ladgov located in Melbourne FL. Find other listings like Bowling Mechanic by searching Oodle for Construction Mechanic Jobs.